How do I set up a production order?

In this tutorial, we are going to show you how to sett up production order.

Setting the production follow order

Products are displayed on your production ticket or kitchen screen based on the product code. By setting a unique product order in the back office, you can determine the follow order.

  • Go to Articles > Products and on the far right you will see Production Order.
  • To organise it, you can uncheck all the columns you don't need at the top under Columns. Uncheck everything except Production order.
  • If necessary, set a filter so that you only see the articles you want to change.
  • If you enter a sequence number, for example 100, all articles with this number will appear together on the work order or kitchen screen. An article with a number below 100 will be printed above articles with the number 100

For example, you would give all meat products to the production order 100, all fish dishes 200 and all salads 300. On the production ticket or on the production screen, the order would then be meat, fish, salads.

Keep in mind, since changes have been made, you must send them to your system by navigating to the general settings.
  1. Go to General
  2. Then navigate to the sub-category General
  3. From there, click on Send to transmit the changes to your system

For further details, please check out our article: How do I send changes from the Backoffice to my POS?

🕹️ Interactive tutorial

🎓 Downloadable PDF

We want your feedback

Your opinion is very important to us. Did you like this tutorial? Was it helpful? Rate it using the emojis down below.

How did we do?

How do I manage and arrange menus (incl. sub-menus)?

How to add a menu with multiple options?

Contact